Perfect for the changing seasons, the B508R provides warmth without being too heavy, thanks to its breathable cotton jersey lining. A ribbed exterior completes the classic chunky knit look and helps keep the chill out. The cuffed design provides optimal opportunity for decoration, and an engineered crown is designed with maximum comfort in mind. Made with 50% recycled polyester content the equivalent of approximately 1.5 post-consumer bottles.
Beechfield – Wind – Resistant Breathable Elements Beanie B508R
£7.15
Estimated delivery dates: Jan 28, 2025 - Feb 2, 2025
SKU: B508R
Categories: Beanies, Beechfield, Beechfield Headwear, Headwear
Tags: Beechfield, Headwear
Brand: Beechfield
BeechfieldRemaining at the forefront of rebrandable fashion, Beechfield® Original Headwear continues it’s commitment to producing versatile headwear that marries style with sustainability. Featuring a range of hats and caps, each piece effortlessly completes any outfit, creating the perfect balance of fashion and function. Bold accessories that make a statement are at the heart of this collection.
BeechfieldRemaining at the forefront of rebrandable fashion, Beechfield® Original Headwear continues it’s commitment to producing versatile headwear that marries style with sustainability. Featuring a range of hats and caps, each piece effortlessly completes any outfit, creating the perfect balance of fashion and function. Bold accessories that make a statement are at the heart of this collection.
Colour | Black, Fire Red, Olive Green, Sapphire Blue |
---|---|
Size | One Size |
Fabric | 50% Polyester, 50% Acrylic. 100% Cotton Jersey lining |
Size | One Size |
Related products
£3.78
Estimated delivery dates: Jan 28, 2025 - Feb 2, 2025
Beechfield
£6.64
Estimated delivery dates: Jan 28, 2025 - Feb 2, 2025
£10.63
Estimated delivery dates: Jan 28, 2025 - Feb 2, 2025
Estimated delivery dates: Jan 28, 2025 - Feb 2, 2025
Estimated delivery dates: Jan 28, 2025 - Feb 2, 2025
£4.40
Estimated delivery dates: Jan 28, 2025 - Feb 2, 2025
Estimated delivery dates: Jan 28, 2025 - Feb 2, 2025
Estimated delivery dates: Jan 28, 2025 - Feb 2, 2025